My project engagements over the years



2021 - 2025
Project Name: Conversion of Agricultural Wastes to Biomaterials and Biofertilizers
Duration: April-November, 2024 (Intermittent)
Project Location: Philippines
Client: GGGI in collaboration with Korea International Cooperation Agency (KOICA)
Project Cost: USD 50M
Position Held: Local Waste & Circular Economy Expert
Project Name: Ridge-to-Reef (R2) Climate Resilience in the Philippines
Duration: August-November, 2024 (Intermittent)
Project Location: Philippines
Client: GGGI in collaboration with Korea International Cooperation Agency (KOICA)
Project Cost: USD 50M
Position Held: Nature-based Solutions Expert
Project Name: Evaluation of the Expanded SURE Aid and Recovery Project (SURE COVID-19)
Duration: April-November 2023 (8 man-months)
Project Location: Philippines
Client: Asian Social Project Services, Inc. (ASPSI)/Agricultural Credit and Policy Council (ACPC)
Project Cost: PhP3.0B+
Position Held: Team Leader cum M&E Specialist
Project Name: Feasibility Study of the Proposed Construction of New Bridge, Pancian Viaduct
Duration: Sept.-Dec. 2023
Project Location: Pagudpud, Ilocos Norte
Client: DPWH R-I/SPACEM Design
Project Cost: PhP2.22B
Position Held: General Economist
Project Name: Feasibility Study of the Proposed Construction of Lopez Viaduct
Duration: Oct-Dec. 2023
Project Location: Lopez, Quezon
Client: DPWH R-4A/SPACEM
Project Cost: PhP2.20B
Position Held: General Economist
Project Name: Master Plan and Feasibility Study of Malolos River/Kalero River and Tributaries for Flood Control
Duration: July 2023 – Jan.2024 (Intermittent)
Project Location: Malolos, Bulacan
Client: SPACEM/DPWH R-III
Project Cost: PhP1.586B
Position Held: General Economist
Project Name: Feasibility Study of Suawan Irrigation Project
Duration: July 2023-April 2024 (Intermittent)
Project Location: Davao City
Client: CEST, Inc./DPWH R-XI
Project Cost: Not specified
Position Held: Economist
Project Name: Feasibility Study of National Septage and Sewerage Management Program – Alaminos City
Duration: May-Sept. 2023
Project Location: Alaminos City
Client: WCI/DPWH R-III
Project Cost: PhP1.3 B
Position Held: Financial Specialist cum Economist
Project Name: Economic Evaluation Report for Legazpi City Urban Drainage Improvement Project
Duration: March-Dec. 2023
Project Location: Legazpi City, Albay
Client: E.H.SISON Engineers Co./DPWH R-V
Project Cost: Not specified
Position Held: Environment Specialist/Resettlement Specialist/Socioeconomist
Project Name: Feasibility Study for the Calamanuigan Bulk Water Supply System
Duration: Sept-Dec. 2023 (3-man months; Intermittent)
Project Location: Camalanuigan, Cagayan Province
Client: Multi-Infra Konsult, Inc.
Project Cost: PhP2.0 B
Position Held: Financial Specialist cum Economist
Project Name: Feasibility Study for the Negros Bulk Water Supply Project
Duration: Jan.-Dec. 2023 (3-man months; Intermittent)
Project Location: Pulupandan and Bacolod City
Client: ALMANA CONSTRUCTION & DEV’T CORPORATION Design and Consultancy
Project Cost: PhP690 M
Position Held: Environment Specialist/Financial Specialist cum Economist
Project Name: Feasibility Study for the Proposed Wastewater Treatment System in River Basins
Duration: June-September, 2022
Project Location: Imus, Canas, and Ylang-Ylang River Basins
Client: JV-CEST and Ergons/EMB CALABARZON
Project Cost: PhP133 M
Position Held: Financial Specialist cum Economist
Project Name: Feasibility Study of Las Nieves National Irrigation Project
Duration: Jan.-August, 2022
Project Location: Las Nieves, Agusan del Norte, Esperanza, Agusan del Sur, and Butuan City
Client: NIA Region XIII (CARAGA)/ASCOTT Pacific Consultants
Project Cost: PhP2.061B
Position Held: VEVA Specialist
Project Name: Feasibility Study for the Solibao River Irrigation Project
Duration: Sept. 2022-May 2023
Project Location: Rosario, Agusan del Sur
Client: NIA Region XIII (CARAGA)/Key Engineers Co.
Project Cost: PhP756 M
Position Held: VEVA Specialist and Economist
Project Name: Feasibility Study for Alauli (Roman Superhighway) Flyover
Duration: February-March, 2022
Project Location: Pilar, Bataan
Client: DPWH/WCI
Project Cost: Not specified
Position Held: Economist
Project Name: Feasibility Study for Kapatagan By-Pass Road
Duration: March-June, 2022
Project Location: Davao and Digos Cities
Client: DPWH R-XI/EHSISON Engrs.Co.
Project Cost: Not specified
Position Held: RAP Specialist/Socioeconomist
Project Name: Feasibility Studies for San Remigio-Bugo-Gen. Fullon-Valderama Road
Duration: September, 2021-January, 2022
Project Location: Province of Antique
Client: DPWH R-VI/EHSISON Engrs.Co.
Project Cost: Not specified
Position Held: RAP Specialist
Project Name: Feasibility Study for Jamindan-Libacao By-Pass Road
Duration: March-July, 2021
Project Location: Capiz and Aklan
Client: DPWH R-VI/EHSISON Engrs.Co.
Project Cost: Not specified
Position Held: Socioeconomist/Environmental Specialist/RAP Specialist
Project Name: Feasibility Study for Maayon-Sara Road Project
Duration: January-May, 2021
Project Location: Iloilo and Capiz
Client: DPWH R-VI/EHSISON Engrs. Co.
Project Cost: Not specified
Position Held: Socioeconomist/Environmental Specialist/RAP Specialist
Project Name: Consulting Services for the Conduct of Feasibility Studies/Preliminary and Detailed Engineering/Economic Analysis/Technical Studies/Traffic Impact Assessment of Juban-Bulan Diversion Road Project, Sorsogon
Duration: January – October, 2020 – February, 2021 (5 man-months)
Project Location: Sorsogon
Client: DPWH R-VI/EHSISON Engrs. Co.
Project Cost: Not specified
Position Held: Socioeconomist/Environmental Specialist/RAP Specialist
Project Name: Consulting Services for the Conduct of Feasibility Studies/Preliminary and Detailed Engineering/Economic Analysis/Technical Studies/Traffic Impact Assessment of Murcia Bypass Road; Granada – Concepcion Road, Negros Occidental
Duration: 2021 (3 months)
Project Location: Negros Occidental
Client: DPWH R-VI/SPACEM Design and Associates (SPACEM)
Project Cost: Not specified
Position Held: Socioeconomist/Economist
Project Name: Consulting Services for the Conduct of Feasibility Study of the Proposed Eastwest Silang Section Road Extension
Duration: 2022 (3 months)
Project Location: Silang
Client: DPWH R-VI/SPACEM Design and Associates (SPACEM)
Project Cost: Not specified
Position Held: Socioeconomist/Economist
Project Name: Consulting Services for the Detailed Engineering of Sangley Access Road & Feasibility Study of the Sangley Access Road Extension (Noveleta-Rosario Diversion Road & Noveleta Link Road)
Duration: 2021 (3 months)
Project Location: Sangley
Client: DPWH R-VI/SPACEM Design and Associates (SPACEM)
Project Cost: Not specified
Position Held: Socioeconomist/Economist



2016 - 2020
Project Name: Feasibility Study of Ihaoan River Irrigation Project, located in Loreto, Agusan del Sur (Contract No. FS-2020-IHAOAN-RIP-001)
Duration: Dec. 2020 – July 2021 (8-man-months, Intermittent)
Project Location: Loreto, Agusan del Sur
Client: NIA Region XIII (CARAGA)/Multi-Infra Konsult, Inc.
Project Cost: PhP364M
Position Held: VEVA Specialist and Economist
Project Name: Feasibility Study of Sultan Naga Dimaporo Small Reservoir Project, located at Sultan Naga Dimaporo, Lanao del Norte (Contract No. CS-LDN FS-2020-SND)
Duration: Jan – Aug. 2021 (8 man-months, Intermittent)
Project Location: Sultan Naga Dimaporo, Lanao del Norte
Client: NIA Region X/Multi-Infra Konsult, Inc.
Project Cost: PhP650M
Position Held: VEVA Specialist and Economist
Project Name: Conduct of Detailed Engineering Study/Design (DES/DED) of Cabacanan Small Reservoir Irrigation Project, Ilocos Norte
Duration: Jan – Aug. 2020 (3 man-months, Intermittent)
Project Location: Ilocos Norte
Client: NIA Region I/Ergons-CEST, Inc.
Project Cost: PhP972M
Position Held: Economist
Project Name: Preparation of the Feasibility Study for the proposed Construction of ‘AA’ Slaughter House Projects in the Municipalities of Ocampo and Ragay, Camarines Sur
Duration: October 2020 – February 2021
Project Location: Ocampo and Ragay, Camarines Sur
Client: World Bank/DA-PRDP/LGU-Ocampo and LGU-Ragay, Camarines Sur
Project Cost: PhP66.00 Million
Position Held: Project Leader/Economist
Project Name: Preparation of the Feasibility Study for the proposed Bangon-Bulawan Jr. FMR and Lupi AA Slaughter House Projects
Duration: January – June, 2020
Project Location: Lupi, Camarines Sur
Client: World Bank/DA-PRDP/LGU-Lupi, Camarines Sur
Project Cost: PhP134.00 Million
Position Held: Project Leader/Manager
Project Name: Consultancy Services for the Feasibility Study of the Proposed Esperanza-Lebak Bypass Road, Sultan Kudarat
Duration: October 2019 – December 2020 (3 months intermittent)
Project Location: Sultan Kudarat
Client: DPWH R-12/ASCOTT Consultants
Project Cost: PhP5.40B
Position Held: Economist
Project Name: Conduct of Feasibility Study and Development Planning for SMC Davao Industrial Park Project, located in Barangays Culaman and Lais, Malita, Davao Occidental (the “Malita Project”), and Hagonoy Poultry Industrial Complex Project, located in Brgy. Hagonoy Crossing, Hagonoy, Davao del Sur (the “Hagonoy Project”)
Duration: October 2019 – February 2020 (5 man-months)
Project Location: Davao Occidental and Davao del Sur
Client: San Miguel Foods, Inc. (SMFI)
Project Cost: PhP6.50B
Position Held: Economist and Financial Specialist
Project Name: Consultancy Services on the Conduct of Feasibility Study of Proposed Surigao del Norte Nautical Highway (Hayanggabon-Bucas Grande Island-Dapa Road); and Feasibility Study of the Esperanza-Lebak By-Pass Road, Sultan Kudarat
Duration: Sept. 2019 – December 2020 (intermittent: 3 months); Nov. 2019 – December 2020 (intermittent: 3 months)
Project Location: Surigao del Norte and Sultan Kudarat
Client: Ascott Pacific Consultants, Incorporated/Key Engineers, Co./DPWH R-XII
Project Cost: PhP1.50B (SDNNH); PhP2.00B Plus
Position Held: Economist and VEVA Specialist
Project Name: Consultancy Services on the Conduct of Feasibility Study for Puyo Small Reservoir Irrigation Project (SRIP), Brgy. Bangonay, Jabonga, Agusan del Norte, Contract No. 02-2018-ASDI-IMO
Duration: May-December 2019 (intermittent: 4 months)
Project Location: Brgy. Bangonay, Jabonga, Agusan del Norte
Client: NIA/Certeza Infosys
Project Cost: PhP3.354 B
Position Held: Economist and VEVA Specialist
Project Name: Consultancy Services for the Formulation of Master Plan and Feasibility Study for the 20-kilometer Cagayan Economic Zone Authority (CEZA) Coastal Boulevard in Santa Ana, Cagayan
Duration: August 2019-April 2020 (intermittent: 3 months)
Project Location: Santa Ana, Cagayan
Client: CEZA/Woodfields Consultants, Inc.
Position Held: Economist
Project Name: Preparation of Master Plan and Feasibility Study for the Flood Mitigation Measures of West Pampanga (Floridablanca, Guagua, Lubao, Porac, Sasmuan, and Sta. Rita) and Detailed Engineering Design of the Lubao and Sasmuan Flood Control Project
Duration: July 2018-July 2020 (intermittent: 4 months)
Project Location: West Pampanga (Floridablanca, Guagua, Lubao, Porac, Sasmuan, Sta. Rita)
Client: DPWH/Woodfields Consultants, Inc.
Position Held: Economist and Financial Analyst/Socioeconomic Specialist
Project Name: Conduct of the Philippine Rural Development Project (PRDP) Midterm Evaluation Study (MES)
Duration: February-July 2019 (intermittent: 5 man-months)
Project Location: Philippines
Client: World Bank/Department of Agriculture/PRIMEX
Project Cost: PhP27 Billion
Position Held: Team Leader and Economist
Project Name: LOAN 50288-001 PHI: Infrastructure Preparation and Innovation Facility – 02 Water (Flood Control)
Duration: June-July 2018; November 2019 (intermittent: 2 months)
Project Location: Philippines
Client: ADB/ASCOTT/INCLAM SEA-EGIS-KECC/DPWH
Position Held: Cost Engineer/Economist
Project Name: Consulting Services for the Master Plan and Feasibility Study of Urban Drainage and Flood Control for Balanga City in Region III and Bacolod City in Region VI
Duration: December 2018-July 2019 (intermittent: 5 months)
Project Location: Balanga City (Region III), Bacolod City (Region VI)
Client: DPWH-CO/PERTCONSULT, Int’l.
Position Held: General Economist/Resettlement Specialist
Project Name: Consulting Services for the Feasibility Study for the Widening and Expansion of the Sulu Circumferential Road, Sulu Transcentral Road and Development of the Jolo Radial Road, Province of Sulu
Duration: September-December 2018 (intermittent: 3 months)
Project Location: Sulu Province
Client: DPWH-ARMM/Woodfields Consultants, Inc.
Project Cost: PhP33.00 Billion
Position Held: Economist/Financial Specialist
Project Name: Consulting Services for the Conduct of Data Gathering, Surveys and Feasibility Study of the Proposed Labason ByPass Road in Zamboanga del Norte 2nd Engineering District
Duration: July-October 2018 (intermittent: 2 months)
Project Location: Zamboanga del Norte
Client: DPWH-R9/Woodfields Consultants, Inc.
Project Cost: PhP452.00 Million
Position Held: Economist/Financial Specialist
Project Name: Consulting Services for the Conduct of Data Gathering, Surveys and Feasibility Study of the Proposed Castilla-Magallanes Road and Bridge/Viaduct Project, Province of Sorsogon
Duration: June-September 2018 (intermittent: 2 months)
Project Location: Sorsogon Province
Client: DPWH-R5/Woodfields Consultants, Inc.
Project Cost: PhP19.00 Billion
Position Held: Economist
Project Name: Conduct of Impact Evaluation of the Light Rail Transit Line 2 (LRT 2) Project
Duration: April-June 2018 (3 months)
Project Location: Philippines
Client: NEDA/Certeza Infosys Corp.
Position Held: Sector Specialist
Project Name: Comprehensive Integrated Development Master Plan (CIMDP) for 4 Economic Zones under the Bases Conversion Development Authority (BCDA)
Duration: January 2018-January 2019 (intermittent: 5 months)
Project Location: Philippines
Client: Bases Conversion and Development Authority (BCDA)/AECOM/PertConsult, Int’l/PhilKoi
Position Held: Assistant Team Leader/Financial Specialist cum Economist
Project Name: Camarines Sur Infrastructure Projects
Duration: December 2017-July 2018 (Full-Time: 1 year)
Project Location: Camarines Sur
Client: DPWH-R5/Woodfields Consultants, Inc.
Project Cost: PhP30.00 Billion
Position Held: Team Leader/Economist
Project Name: Technical Feasibility Study & Design of Seven Proposed Project Sites in Concepcion, Iloilo for the Application of Hybrid Green-Grey Infrastructure Solutions for Climate Resilience and Disaster Risk Reduction Project
Duration: December 2016-August 2017
Project Location: Concepcion, Iloilo
Client: Conservation International Philippines Foundation Inc. (CIPFI)/ASCOTT Pacific
Position Held: Economist cum Financial Analyst



2011 - 2015
Project Name: Integrated Natural Resources and Environmental Management Project (INREMP)
Duration: August 2015-2020 (22 man-months intermittent)
Project Location: Four (4) Upland River Basins of Chico-Cordillera, Bohol, Bukidnon, and Lanao Lake
Client: FMB-DENR/ADB/IFAD/CESM
Project Cost: PhP3.00 Billion
Position Held: Economist
Project Name: Preparation of Feasibility Study for the North Luzon Expressway- East (Phase 1&2)/Public –Private Partnership
Duration: June-October 2017 (intermittent: 3 months)
Project Location: La Mesa Parkway to Cabanatuan City
Client: AusPhil/Filipinas Dravo Inc.
Project Cost: PhP7.80 Billion (initial project cost-phase 1)
Position Held: Financial Specialist cum Economist
Project Name: Consulting Services for On-the–Job Capacity Building on Value Engineering/Value Analysis (VEVA) for Infrastructure Projects with NEDA
Duration: January 2016-March 2018 (intermittent: 8 months)
Project Location: Philippines
Client: NEDA/Berkman International
Position Held: Economic Infrastructure Specialist
Project Name: Consulting Services on Value Engineering/Value Analysis (VEVA) Study on Irrigation for Food Security
Duration: May-November 2016 (intermittent: 3 months)
Project Location: NIA Projects in the Provinces of Quezon, Mindoro Occidental, and Cebu
Client: NEDA/CEST Inc.
Position Held: Economist/VEVA Specialist
Project Name: Preparation of Feasibility Study for the Proposed Inagawan, Malatgao, and Marangas Hydropower Plant Projects
Duration: June-December 2016 (intermittent: 3 months)
Project Location: Palawan, Philippines
Client: Paragon Pegasus Solutions, Inc.
Project Cost: PhP2.06 Billion
Position Held: Financial Specialist cum Economist
Project Name: Conduct of Feasibility for the C-5-Katipunan Viaduct Project
Duration: March–December 2016 (intermittent: 3 months)
Project Location: Quezon City
Client: DPWH/WCI
Project Cost: PhP4.6 Billion
Position Held: Economist
Project Name: Master Plan and Feasibility Study on Flood Control and Drainage Projects
Period of Assignment: January-December, 2015 (Intermittent: 5 months)
Client/Location: DPWH/PERTCONSULT, INT’L; Catbalogan City, Samar, Daguitan-Marabong, Leyte, Caguray, Magsayasay, Mindoro Occidental, and Bago City, Negros Occidental
Project Cost: PhP4.0 Billion
Position Held: ECONOMIST
Project Name: Climate Resiliency and Green Growth in Critical Watersheds
Period of Assignment: July 2014 – December 2016 (Intermittent: 20 man-months)
Client/Location: Climate Change Commission/ ADB/Japan Fund For Poverty Alleviation/SEARCA/WCI/CTI/ERGONS, INC.
Position Title: National Natural Resource Management Economist
Project Name: Feasibility Study Preparation of the Gandara and Maringalo Irrigation Projects
Period of Assignment: March-May 2015 (Intermittent: 3 months)
Client/Location: National Irrigation Administration/Woodfields Consultants, Inc. (WCI)
Project Cost: PhP5 Billion
Position: Financial Analyst/Economist
Project Name: Third Party Monitoring and Evaluation of the DA Farm-to-Market Road at DA-Cordillera Administrative Region
Period of Assignment: Jan-April 2015 (Intermittent: 2 months)
Client/Location: DA-CAR/WCI
Position: Monitoring and Evaluation Specialist
Project Name: Consultancy Services for the Conduct of Master Planning and Preparation of Feasibility Study for the Bantay Ecotourism Project
Period of Assignment: Sept.-Nov. 2015 (3 months)
Client/Location: TIEZA/Berkman International
Project Cost: PhP3.0 Billion
Position Title: Investment Specialist
Project Name: Bohol Water Supply Project (Public-Private Partnership)
Period of Assignment: August-November 2015 (Intermittent: 3 months)
Client/Location: USAID/Provincial Government of Bohol/EDCOP, Inc.; Province of Bohol
Project Cost: PhP3.20 Billion
Position Title: Financial Specialist
Project Name: Conduct of Feasibility Study (F/S) for the General Trias Septage Management Project
Period of Assignment: 2015 (3 months)
Client/Location: EMB-DENR (Manila Bay Office); LGU Gen Trias, ASCOTT Consultants, Int’l; General Trias, Cavite
Project Cost: PhP52.00 Million
Position Title: Financial Analyst/Economist and Institutional Dev’t Specialist
Project Name: Due Diligence Study for seven (7) Hydropower Projects
Period of Assignment: May-September 2015 (5 months)
Client/Location: Cosmic Management and Technologies, Inc./Century Peak Corp.; Provinces of Iloilo, Antique, and Negros Occidental
Project Cost: PhP4.00 Billion
Position Title: Financial Specialist/Economist
Project Name: Kabulnan 2 Hydropower and Irrigation Multi-Purpose Project
Period of Assignment: February to October 2015 (Intermittent: 3 months)
Client/Location: NEDA/NIA/SMEC Phil.; Sultan Kudarat and Maguindanao
Project Cost: PhP31.20 Billion
Position Title: Economist cum Agriculturist
Project Name: Feasibility Study of (Public Private Partnership) Bridges (110 bridges)
Period of Assignment: January – December 2014 (Intermittent: 6 months)
Client/Location: PERTCONSULT International / DPWH; Luzon-Regions I-V and CAR
Project Cost: PhP4.40 Billion
Position Held: Economist
Project Name: Mindanao Rural Development Program APL-2 (MRDP-2) End-of-Project Evaluation
Period of Assignment: June – September 2014 (4 man-months)
Client/Location: PRIMEX/DA-MRDP – World Bank; Mindanao Regions
Position Held: Team Leader/Agricultural Economist
Project Name: Final Performance Evaluation of Micro Enterprise Access to Business (MABS)
Period of Assignment: March – May 2013 (3 man-months)
Client/Location: Sustainable Development Solutions/USAID-PHIL; Nationwide
Position Held: Team Leader
Project Name: Philippine Rural Development Program (PRDP) Baseline Study
Period of Assignment: August 2013 – March 2014; Nationwide (6 man-months)
Client/Location: Sustainable Development Solutions/DA/World Bank; Nationwide
Project Cost: PhP27.00 Billion
Position Held: Team Leader/Agricultural Economist
Project Name: Consultancy Services for the Conduct of Business Case Studies of Selected Public-Private Partnership (PPP) Projects, Phase II, Package II (North Luzon Expressway-East)
Period of Assignment: April-October 2013 (3 months)
Client/Location: Pertconsult International/DPWH; Bulacan and Nueva Ecija
Project Cost: PhP52.00 Billion
Position Held: Financial Analyst/Modeler
Project Name: Tulunan Small Reservoir Irrigation Project
Period of Assignment: August 2013 – January 2014 (Intermittent: 3 months)
Client/Location: National Irrigation Administration, Region XII
Project Cost: PhP635.70 Million
Position Held: Economist/Agricultural Engineer
Project Name: Tiwi Water Supply Project and El Nido Water Supply and Sanitation Project
Period of Assignment: March – September 2013 (Intermittent: 5 months)
Client/Location: LGU-Tiwi, Albay and El Nido/WCI; Tiwi, Albay and El Nido, Palawan
Project Cost: Php200 Million
Position Held: Financial Analyst/Economist
Project Name: Ex-Post Evaluation of JICA-Funded Project for Mindanao Sustainable Settlement Area Development Project (MinSSAD)
Period of Assignment: November 2012 – January 2013 (3 man-months)
Client/Location: DAR/JICA; Mindanao
Project Cost: PhP3.00 Billion
Position Held: National Consultant/Survey Team Leader cum Institutional Development Specialist
Project Name: Quantitative Baseline Study for KALAHI-CIDSS
Period of Assignment: February – December 2012 (Intermittent: 6 months)
Client/Location: Millennium Challenge Account-Phil (MCA-P); Nationwide
Position Held: Regional Field Coordinator
Project Name: Integrated Naga River Revitalization Project
Period of Assignment: August 2011 – January 2012 (Intermittent – 2.5 months)
Client/Location: CDIA/ADB; Naga City
Project Cost: PhP2.00 Billion
Position Held: Asst. Deputy Team Leader and Capacity Development/Institutional Development Specialist
Project Name: Master Plan and Feasibility Study of the Proposed Manila Bulk Terminal Project (Public-Private Partnership)
Period of Assignment: September 2011 – January 2012 (Intermittent – 3.5 months)
Client/Location: Philippine Ports Authority; Basic Technology and Management, Inc./Schemakonsult, Inc.; Metro Manila
Project Cost: PhP3.00 Billion
Position Held: Economist cum Transport Economist
Name of Project: Ore and Nickel Mining Project
Period of Assignment: October – December 20, 2010 (3 months)
Client/Location: CELPA Inc./CESSMAG; Cagayan de Oro City
Position Held: Financial Specialist/Economist/Deputy Team Leader
Name of Project: Master Plan and Feasibility Study on Flood Control of Guinabasan River Basin, Cebu Province
Period of Assignment: September – November 2010 (2 months intermittent)
Client/Location: DPWH/WCI; Province of Cebu
Project Cost: PhP500.00 Million
Position Held: Economist



2006 - 2010
Name of Project: Baseline Study on MINDANAO RURAL DEVELOPMENT PROGRAM PHASE 2 (MRDP-2)
Period of Assignment: June 15, 2010 – February 2011 (Intermittent: 7 months)
Client/Location: Worldbank/Dept. of Agriculture; Philippines
Position Held: Team Leader/Agricultural Economist
Name of Project: Impact Assessment Study of Solar Power Technology Support (SPOTS) Project – Phase I
Period of Assignment: October 6, 2009 – December 2009 (3 months)
Client/Location: Department of Agrarian Reform/Spanish Government; Mindanao
Project Cost: PhP3.00 Billion
Position Held: Agricultural Economist/Econometrician
Name of Project: Project Benefit Monitoring and Evaluation of Bridges
Period of Assignment: September 15, 2009 – November 2009 (3 months)
Client/Location: Woodfields Consultants, Inc./DPWH; Nationwide
Position Held: Economist
Name of Project: Mega Bridges for Urban and Rural Development Project Under the President’s Bridge Program
Period of Assignment: February 1, 2009 – October 2013 (Intermittent: 2 years)
Client/Location: DPWH – President’s Bridge Program/Matiere/WCI; Nationwide
Project Cost: PhP18.00 Billion
Position Held: Team Leader/Economist
Name of Project: Updating of the Rapid Feasibility Study Report on Bangon Falls Power Generation Project in Calbayog City
Period of Assignment: February 1, 2009 – April 30, 2009 (Intermittent: 2 months)
Client/Location: Clean and Green Corporation/WCI; Western Samar
Project Cost: PhP500 Million
Position Held: Economist/Financial Specialist
Name of Project: Feasibility Study on the Use and Development of Surface Water – Tamugan River
Period of Assignment: February 1, 2009 – February 2010 (Intermittent: 5 months)
Client/Location: Davao City Water District/WCI; Davao City
Project Cost: PhP6.20 Billion
Position Held: Economist/Financial Specialist
Name of Project: Feasibility Study Preparation of the Doncilla Island Eco-Tourism Project entitled: Conservation and Promotion of Agro-Ecological Diversity Through Tourism
Period of Assignment: March 1, 2008 – December 31, 2008 (Intermittent: 6 months)
Client/Location: Local Government Unit – Magarao, Camarines Sur
Project Cost: PhP30.00 Million
Position Held: Consultant/Environmental Expert/Institutional Development Specialist
Name of Project: Ex-Post Evaluation Study on the Project for Improvement of Farmers’ Income through the Strengthening of Agricultural Cooperatives
Period of Assignment: November 1, 2008 – December 2008; Benguet Province (2 months)
Client/Location: PrimeLogic Consulting, Inc./JICA Funded
Position Held: Team Leader
Name of Project: Initial Impact Assessment of the Mindanao Sustainable Settlement Area Development Project
Period of Assignment: April 1, 2008 – July 15, 2008 (Intermittent: 4 months)
Client/Location: Department of Agrarian Reform, JBIC Funded; Mindanao
Project Cost: PhP3.00 Billion
Position Held: Team Leader/Agricultural Economist
Name of Project: 2008 Rate Rebasing Exercise for Maynilad Water Services Inc. (MWSI)
Period of Assignment: February 15 – November 15, 2008 (Full-time: 10 months)
Client/Location: SMEC Philippines Inc. – GEF/WorldBank/MWSS; Metro Manila
Position Held: Team Leader
Name of Project: Feasibility Study and Business Plans for the Philippine National Oil Company – EDC Livelihood Projects
Period of Assignment: July – December 2007 (Full-Time: 6 months)
Client/Location: PNOC-EDC/INTEM; 6 Geothermal Plants in Luzon, Visayas, and Mindanao
Project Cost: PhP100.00 Million
Position Held: Team Leader
Name of Project: Market Study on the Existing and Potential Real Water Demand of Metro Cebu
Period of Assignment: January – July 2007 (Intermittent: 5 months)
Client/Location: Metro Cebu Water District; Cebu Province
Position Held: Project Manager & Economist
Name of Project: El Nido Water Supply Project
Period of Assignment: February – April 2007 (3 months)
Client/Location: Municipality of El Nido, Palawan/WCI
Project Cost: PhP60.00 Million
Position Held: Economist cum Financial Specialist/Institutional Development Specialist
Name of Project: Panabo City Drainage and Sewerage Project
Period of Assignment: September 2006 (1 month)
Client/Location: LGU-Panabo City/WCI
Position Held: Economist & Financial Specialist
Name of Project: Feasibility Study on the Formulation of Municipal Waterworks Plan of Cabugao, Ilocos Sur
Period of Assignment: April 2006 – May 2007 (Intermittent: 5 months)
Client/Location: LGU-Cabugao/WCI; Ilocos Sur
Project Cost: PhP60.00 Million
Position Held: Economist & Financial Specialist/Institutional Development Specialist
Name of Project: Feasibility Study Preparation of Sanitary Landfill Projects/Septage Project; Waste to Energy Project
Period of Assignment: February 2006 – January 2007; January-May 2008 (Intermittent: 10 months)
Client/Location: JICA/Woodfields Consultants, Inc.; Cities of Sagay, Davao, and Calbayog, Montalban Sanitary Landfill, Metro Manila Waterworks and Sewerage System Septage Project, Tacloban City Sanitary Landfill, Bayambang Sanitary Landfill, Panabo City Sanitary Landfill, Virac Sanitary Landfill and Solid Waste Management Project, Green Island Sanitary Landfill Project; Ilocos Sur Waste to Energy Project
Project Cost: PhP500.00 Million
Position Held: Economist & Financial Analyst
Name of Project: Feasibility Study of Ilagan Civic Center Complex Project
Period of Assignment: July – August 2006 (2 months)
Client/Location: LGU-Ilagan, Isabela
Project Cost: PhP197.00 Million
Position Held: Economist & Financial Specialist
Name of Project: Project Benefit Monitoring and Evaluation Report of Nine (9) Completed Bridge Project (PBME)
Period of Assignment: March-May 2006, December 2006 – February 2007 (Intermittent: 4 months)
Client: MABEY & Johnson Corp/DPWH/WCI
Position Held: Economist & Financial Analyst
Name of Project: Buhi Resources for Environment and AgroEcosystem Development (BREAD)
Period of Assignment: August 2006 (1 month)
Client/Location: Bicolandia Greenfields Development Organization, Inc.; Buhi, Camarines Sur
Position Held: Consultant/Environmental Economist
Name of Project: SAVE Ragay (Sustainable AgroEcosystem Development: Vehicle for Economic Reconstruction and Recovery)
Period of Assignment: August 2006 (1 month)
Client/Location: Bicolandia Greenfields Development Organization, Inc.; Ragay, Camarines Sur
Position Held: Consultant



1989 - 2005
Name of Project: United Nations Development Program (UNDP) Small Grants Program
Period of Assignment: December 2005 (1 month)
Client/Location: Bicolandia Greenfields Development Organization, Inc.; Camarines Sur
Position Held: Consultant
Name of Project: Mount Isarog Natural Park/PAMB Assessment Project
Period of Assignment: June 2001 – July 2001 (2 months)
Client/Location: CARE, Philippines; Mt. Isarog, Camarines Sur
Position Held: Project Consultant/Environmental Specialist
Name of Project: Community-Based Resources Management Project (CBRMP)
Period of Assignment: Apr. 2001, May-Aug 2001, September-October 2000, June-September 2000, February.-June 2000, September-November 2000, January–February 2000 (Intermittent: 10 months)
Client/Location: Department of Finance (DOF)–Local Government Units/ World Bank; Presentacion Resources Integrated Management on Ecosystem Project (PRIME); Siruma Coastal and Upland Resources for Environmental Conservation; San Pascual Integrated Coastal and Upland Resources Management Program; Gainza River Ecosystem and Environmental Project (GREEN); Canaman River Ecosystem Development and Management Project (CREAM); Talisay Rivers for Environmental and Economic Sustainability Project (TREES); Lagonoy Integrated Land and Marine Development and Rehabilitation Project
Project Cost: PhP75.00 Million
Position Held: Team Leader/Resource Economist cum Financial Specialist/Institutional Development Specialist
Name of Project: Quirino Highway Greening Project for Sipocot-Ragay, Camarines Sur
Period of Assignment: 1996 – 1999 (Intermittent: 2 years)
Client: Bicolandia Greenfields Development Organization, Inc.
Position Held: Consultant/Environmental Economist
Name of Project: DA-DAR-DENR Convergence Areas
Period of Assignment: November 1998 (1 month)
Client: Government Convergence Team
Position Held: Consultant/Team Leader
Name of Project: Pecuaria Estate Integrated Development Plan
Period of Assignment: May 1997 – July 1997 (3 months)
Client: Camarines Sur State Agricultural College
Position Held: Consultant
Name of Project: Pili Master Plan
Period of Assignment: July 1997 – October 1997 (3 months)
Client: Movement for Accelerated Development Efforts (MADE) in Bicol, Inc
Position Held: Consultant
Name of Project: SocioEconomic Profile and Municipal Development Plans
Period of Assignment: January 1991 – July 1991 (Intermittent: 4 months)
Client: LGUs–San Jose and DelGallego, Camarines Sur
Position Held: Consultant/Team Leader
Name of Project: Canaman-Magarao-Bombon Integrated Area Development Project
Period of Assignment: August 1989 – December 1989 (Fulltime)
Client: LGU – Camarines Sur
Position Held: Consultant/Team Leader
CP# 09171500968 | dochectorsales@gmail.com | Naga City, Bicol, Philippines | fb: Hector Sales